VB and Agro Care: partnership since 2013

Agro Care & VB

157HA
EUR
  • Client Agro Care
  • Area Total of approximately 157 hectares heated since 2013.
  • Produce Tomatoes
  • Location Tunisia, France and the Netherlands
  • Year(s) 2013-2025
"Since 2013, VB has heated approximately 157 hectares for Agro Care."
Marco de Bruijne, VB Climate

Project request

Agro Care and VB have been working together on climate and greenhouse heating installations since March 2013. The first order concerned a 2.5-hectare new-build project in Tunisia. This was followed by several expansions and new locations in Tunisia, projects in Brécey and D’Isigny in France, and, at the end of 2025, greenhouse heating for the reconstruction of a phase in Middenmeer. In total, VB has heated approximately 157 hectares for Agro Care since 2013.

Challenge and approach

The projects call for installations that can grow with each phase and be adapted to the facilities available at each location. VB supplied boiler/burner installations, manifolds, expansion systems, connections to heat storage tanks, underground transport pipes, pipe-rail and grow-pipe systems, and CO2 installations. VB also contributed additional climate solutions, including cooling irrigation water with heat pumps, pad-and-fan cooling with a climate corridor, and a dehumidification pilot.

Result and characteristics

The result is a long-term, continuous partnership in which VB supports Agro Care step by step in growth and optimisation. The installations have been applied at existing and new sites in Tunisia, France and the Netherlands. A notable example is the fourth phase at the new site in Tunisia, where VB supplied not only the new boiler house but also the first heat storage tank for Agro Care in Tunisia. The partnership shows how technical expertise and continuity enable scalable growth.

Agro Care and VB partnership since 2013

See how the partnership has grown step by step
Step 1

Start in Tunisia

In March 2013, VB received the first order for Agro Care: the climate installation for a 2.5-hectare new-build project in Tunisia, including greenhouse heating and a heat pump to cool irrigation water further and use the heat for the greenhouse.

Step 2

Phased expansion

Between 2014 and 2019, several expansions followed at the same location in Tunisia. VB supplied underground transport pipes, pipe-rail systems and CO2 installations, among other components. The scope also included boiler installation expansions, a new boiler house and pad-and-fan cooling with a climate corridor.

Step 3

Projects in France

From 2018 onwards, VB also worked on Agro Care projects in France, including Brécey and D’Isigny. The deliveries consisted of complete greenhouse heating installations with boiler/burner installations, CHP connections, heat storage tanks, grow-pipe systems and CO2 installations.

Step 4

New site in Tunisia

From 2021, the partnership continued to grow at a new site in Tunisia. Across multiple phases, VB supplied installations for large greenhouse areas, including a new boiler house and the first heat storage tank that VB supplied for Agro Care in Tunisia.

Step 5

First project in the Netherlands

At the end of 2025, VB received the order for its first project in the Netherlands: greenhouse heating for the reconstruction of a phase in Middenmeer. The delivery includes underground transport piping, pipe rail, grow pipes and the connection of air handling units